PREMIUM
Water

Works planned for Lake Eildon power station

The Lake Eildon spillway.

Goulburn-Murray Water will soon begin releasing water through Lake Eildon’s spillway while maintenance works are conducted on the power station.

Hold tight - we’re checking permissions before loading more content